INDIA Set to build 2365 Km "High Speed" Bullet Train with 320 Km/hr ? 4 Lakh Crore investment

j

by Kivi

}

12.28.2021



Translink Infrastructure Consultants today emerged as the lowest bidder to prepare general arrangement drawings (GADs) for developing Detailed Project Reports (DPRs) for 2365 km of new High-Speed Rail lines in India.

This contract relates to the following 4 proposed high speed rail lines for which various surveying works are currently underway.
_______________________________________
Article:-https://themetrorailguy.com/2021/12/21/translink-wins-gad-work-for-2365-km-of-high-speed-rail-lines/
________________________________________
#Brightideas
#BatteryTechnology
#MakeinIndia
_______________________________________________
Disclaimer :- Video is for educational purpose only. Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for “fair use” for purposes such as criticism, comment, news reporting, teaching, scholarship and research. Fair use is a use permitted by copyright statue that might otherwise be infringing.
-This video has no negative impact on the original works (It would actually be positive for them)
-This video is also for teaching purposes.
-It is not transformative in nature.
-I only used bits and pieces of videos to get the point across where necessary.

Like & Subscribe 🙂

source

Kiviac.com is reader-supported. When you buy through links on our site, we may earn an affiliate commission.

Featured Articles

FOLLOW US

Comments

0 Comments

Related Posts

California Sets Aside $200 Million To Revive EV Incentives

California Sets Aside $200 Million To Revive EV Incentives

California hopes to bring back state incentives to boost electric vehicle adoption. Its Clean Vehicle Rebate project ended in 2023. A new budget proposal from California Governor Gavin Newsom looks to make up for the loss of the $7,500 federal EV tax credit....