7 January 2022 EDTP Progress at KM746.75 Jalan Petaling Johor Bahru Railway Line

j

by Kivi

}

01.15.2022



Just for some updates at this location ?☺️. But, the contractors has dismantled the old single tracks ?️ and placed them just opposite of the original position. Now, it’s called a pile of old railway tracks ?️ ?…

source

Kiviac.com is reader-supported. When you buy through links on our site, we may earn an affiliate commission.

Featured Articles

FOLLOW US

Comments

0 Comments

Related Posts

Giving Drivers Protection, Risk Reduction and Legal Security

Giving Drivers Protection, Risk Reduction and Legal Security

This article may contain affiliate links. Fleet managers have bigger responsibilities than are sometimes assumed. Handling of vehicles is not the only aspect of the job. The actual problem is to make sure that all drivers drive safely, all cars comply with the...